Forres Sandle Manor

Enhancing access and inclusion across every level

Project Details

Forres Sandle Manor is an independent school in Fordingbridge, Hampshire, catering to pupils aged 2–16. The school commissioned a new STEAM (Science, Technology, Engineering, Arts, and Mathematics) building to provide modern, specialist learning spaces, including science laboratories, a design and technology hub with CAD suite, art studios with gallery space, a library, and classrooms.

As this was a brand-new facility, the school was able to include accessibility features from the outset. Ensuring that all pupils, staff, and visitors could move freely throughout the two-storey building was a key priority. The platform lift was essential to provide access to the upper floor and classrooms, creating a fully inclusive learning environment.

Access Solution

The Platform Lift Company supplied and installed a lift integrated into the STEAM building’s fully glazed entrance atrium. The lift was carefully coordinated with the building design to complement its modern aesthetic while providing reliable vertical transport across all floors.

As part of the original building plan, the installation was straightforward, with no disruptions or unexpected challenges. The lift serves all classrooms, staff areas, and shared facilities, ensuring accessibility throughout the facility.

The Result

The platform lift has successfully delivered full accessibility to the STEAM building, allowing all pupils and staff to access every floor and learning space independently. The lift integrates seamlessly into the building’s design, providing a modern and functional solution that enhances the overall environment.

The installation reflects the school’s commitment to accessibility and demonstrates The Platform Lift Company’s ability to deliver reliable, high-quality solutions for new-build educational environments.

Where shall we send the brochure to?