Platform Lift Case Studies
A showcase of projects providing access solutions across all business sectors
Home / Projects
The Platform Lift Company replaced an existing platform lift at a high street gaming and betting shop, maintaining access to the main service desk and supporting accessibility for all customers….
A new platform lift was installed to ensure full accessibility across all floors of the state-of-the-art STEAM building at Forres Sandle Manor School….
The Platform Lift Company supplied and installed a freestanding platform lift at ECHO’s Studio Mirai project in Leominster. Through a charitable initiative, the lift was provided free of charge, with only delivery, survey and…
The Platform Lift Company delivered a modern platform lift solution at Andover College in Hampshire, replacing an unreliable existing lift. The upgrade has significantly …
Soon after opening, the vineyard recognised that visitors requiring wheelchair access were unable to reach the second-floor coffee shop and tasting rooms, resulting in lost bookings for both regular visits and private events….
Marlborough Town Council operates from the historic Town Hall on the High Street in Marlborough. The traditional, two-storey listed building is used for local government functions as well as community and private hire….
Victoria is a multifunctional events and celebration venue housed within a collection of historic buildings originally constructed in 1884. …
Riverside Stables is a domestic property conversion located in a traditionally styled building, originally serving as a stable. The property features two floors, with key living areas such as bedrooms and bathrooms located on…
More Education is a charity dedicated to providing support for local autistic and neurodivergent individuals, as well as those with learning disabilities….
Specs of Kensington, a modern opticians located on Kensington High Street, opened a new store but faced a key accessibility issue. The shop’s lower level, which houses important services such as toilets and consultancy rooms,…
The homeowner, who experienced limited mobility following a stroke, needed renovations to improve accessibility in their two-storey Victorian flat. …
Paradigm Developments, a York-based construction company, was tasked with restoring a Grade II listed Georgian coach house….
All case studies are displayed.